Throughout the whole project, the integral model ensured effective communication and early design omissions identification. It was used for Clash Detection (both visual and automatic). ![]() All the documents necessary for construction, such as drawings, quantity take-offs, reinforcement schedules and lists of equipment were generated based on these Revit models.įor BIM Coordination, Integral model was created and managed in Navisworks. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |